It was a good week. In the blink of an eye, the spaces start to take shape. The framing has been going up quickly, followed by some of the gypsum board (sheetrock) on one side, so plumbing and electrical work can be done on the opposite side.
Romy and his crew, Hanson and Jacquie Chan (even Romy doesn't know his real name), completed all the plumbing connections in the ceiling of the floor below us. Some of this is really trial and error. The water supply line turned out not to have any water in it and one wet core drilling of the slab found some live, buried electrical conduits. Romy made his way around all of these obstacles. This is some of the joy of working in an old building.